Larossa Phase 1, Design and Construction of Three (3) Buildings Eleven (11) Storey (1A-Camia, 1C-Sampaguita and 1B- Magnolia)
Scope of Works: Design and Construction of Three (3) Buildings Eleven (11) Storey (1A-Camia, 1C-Sampaguita and 1B-Magnolia) including excavation and trimming, civil and structural works, architectural and finishing works, electrical works, mechanical and plumbing works, equipment operations and maintenance works.
Location: Philippines, NCR, Metro Manila, Quezon City, Matandang Balara
Project Cost: PHP 1,300,528,232.40
Date Completed: July 2012 to August 2017

Rehabilitaiton and Reconstruction of Roads with Slips, Slope Collapse, and Landslide along Tablas Circumferential Road, Romblon
Scope of Works: Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse and Landslide
Location: Philippines, MIMAROPA Region, Romblon
Project Cost: PHP 128,098,069.24
Date Completed: May 2021 to May 2022

Rehabilitation and Reconstruction of Roads with Slips, Slope Collapse, and Landslide along Tablas Circumferential Road, Romblon
Scope of Works: Roads: Construction – slope protection using structural measures (revetment, retaining structures, wirenet)
Location: Philippines, MIMAROPA Region, Romblon
Project Cost: PHP 137,313,210.97
Date Completed: April 2021 to April 2022

Rehabilitation and Reconstruction of Roads with Slips, Slope Collapse, and Landslide along Romblon-Cogon-Sablayan Road, Romblon
Scope of Works: Roads: Construction – slope protection using structural measures (revetment, retaining structures, wirenet)
Location: MIMAROPA Region, Romblon, Philippines
Project Cost: PHP 171,404,431.97
Date Completed: April 2021 to April 2022