Projects completed under

Philippines

Harbour Port Terminal, Inc. Improvement and Rehabilitation Project

Scope of Works: Concreting of port apron & berthing area including pile driving; containment structure and supply and delivery of mooring bollards; yard concreting and paving including water distribution system; and horizontal development of 79 has. road networks including electrical distribution electrical distribution system.

Project Cost: PHP 1,706,195,000.78

Date Completed: May 2013 to May 2015

Rehabilitaiton and Reconstruction of Roads with Slips, Slope Collapse, and Landslide along Tablas Circumferential Road, Romblon

Scope of Works: Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse and Landslide

Project Cost: PHP 128,098,069.24

Date Completed: May 2021 to May 2022

Rehabilitation and Reconstruction of Roads with Slips, Slope Collapse, and Landslide along Tablas Circumferential Road, Romblon

Scope of Works: Roads: Construction – slope protection using structural measures (revetment, retaining structures, wirenet)

Project Cost: PHP 137,313,210.97

Date Completed: April 2021 to April 2022

Rehabilitation and Reconstruction of Roads with Slips, Slope Collapse, and Landslide along Romblon-Cogon-Sablayan Road, Romblon

Scope of Works: Roads: Construction – slope protection using structural measures (revetment, retaining structures, wirenet)

Project Cost: PHP 171,404,431.97

Date Completed: April 2021 to April 2022