Projects completed under

Philippines

Construction of Taxiway Access Road at Clark International Airport South-End Area

Scope of Works: Construction of New Taxiways and access road at Clark International Airport South End Area which includes construction of Taxiway shoulders, apron, drainage, markings and visual aids, and other related works.

Project Cost: PHP 86,975,099.26

Date Completed: June 2019 to February 2021

Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide – Secondary Roads, Tagudin – Cervantes Road (S00140LZ), Suyo, Ilocos Sur

Scope of Works: Construction of drainage and slope protection structures. Installation of active protection system along Tagudin – Cervantes

Project Cost: PHP 57,338,819.85

Date Completed: Áugust 2020 to January 2021

Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide, – Tertiary Roads, Cervantes – Mankayan – Abatan Road

Scope of Works: Construction of drainage and slope protection structures. Installation of active protection system along Cervantes – Mankayan – Abatan Road

Project Cost: PHP 57,338,819.85

Date Completed: Áugust 2020 to January 2021

Converge and Special Support Program; Construction/Improvement of access roads to leading to trades, SCTEX connecting road

Scope of Works: Demobilization, Individual Removal of Trees, Removal of Structures and Improvement of access roads to leading to trades, SCTEX Obstruction, Unsuitable Excavation, Structure Excavation, Embankment connecting road in support of furniture, 1T-BPM, Hotels, from Borrow, Subgrade Preparation, Aggregate Subbase Course, PCCP Garments and Textile Industries, Angeles City, Pampanga. (Unreinforced) 0.30m thk., Reinforcing Steel (Grade 40). Structural Concrete (Class A). Pipe Culverts, Metal Guard Rail including Post, Metal Beam End Piece, Furnishing and Placing Topsoil, Sodding, Reflectorized Pavement Markings (yellow) and Reflectorized Pavement Marking(white)

Project Cost: PHP 27,841,585.38

Date Completed: May 2019 to January 2020

Philippines Export Zone {PEZA) Road connecting Angeles – Magalang Road to East Circumferential Road

Scope of Works: Mobilization/Demobilization, Individual Removal of Trees {small, 501-750mm ¢), Removal of Structures and Obstruction, Unsuitable Excavation {Roadway Excavation), Structure Excavation, Embankment from Borrow, Subgrade Preparation, Aggregate Subbase Course, Portland Cement Concrete Pavement (Unreinforced) 0.30m thk., Reinforcing Steel {Grade 40), Structural Concrete (Class A}, Reflectorized Thermoplastic Pavement Markings White, and Curb and Gutter (Cast in Place).

Project Cost: PHP 13,888,690.00

Date Completed: May 2019 to November 2019

Larossa Phase 1, Design and Construction of Three (3) Buildings Eleven (11) Storey (1A-Camia, 1C-Sampaguita and 1B- Magnolia)

Scope of Works: Design and Construction of Three (3) Buildings Eleven (11) Storey (1A-Camia, 1C-Sampaguita and 1B-Magnolia) including excavation and trimming, civil and structural works, architectural and finishing works, electrical works, mechanical and plumbing works, equipment operations and maintenance works.

Project Cost: PHP 1,300,528,232.40

Date Completed: July 2012 to August 2017

Harbour Port Terminal, Inc. Improvement and Rehabilitation Project

Scope of Works: Concreting of port apron & berthing area including pile driving; containment structure and supply and delivery of mooring bollards; yard concreting and paving including water distribution system; and horizontal development of 79 has. road networks including electrical distribution electrical distribution system.

Project Cost: PHP 1,706,195,000.78

Date Completed: May 2013 to May 2015

Construction of the Proposed Department of Chemical Engineering Building Engineering Complex, U.P., Diliman, Quezon City

Scope of Works: Construction of the Proposed Department of Chemical Engineering Building (Eight Faculty Rooms and Six Classrooms, Chemical Engineering Research, Instructional and Extension Laboratories) equipped with centralized air-conditioning units, electrical and mechanical system and land development.

Project Cost: PHP 115,438,596.47

Date Completed: June 2011 to September 2014

Design and Build of Joint Sewage and Septage Treatment Plant and Facilities

Scope of Works: Design and build of joint sewage and septage treatment plant and facilities which includes civil works, electro-mechanical works, installation and other services, design services and supply and delivery of plant and equipment.

Project Cost: PHP 266,277,888.00

Date Completed: December 2011 to August 2014

Planning, Design, Construction and Site Development of the Proposed Hawker’s Plaza

Scope of Works: Development of the Proposed Hawker’s Plaza Calapan City Public Market; Planning, Design, Construction & Site Development of the Proposed Hawker’s Plaza at the Calapan City Public Market.

Project Cost: PHP 12,047,747.00

Date Completed: November 2012 to March 2013