Reconstruction, Widening and Extension of R.C. Pier
Project Title: Reconstruction, Widening and Extension of R.C. Pier – Breakwater Project Port of Maasin, Southern Leyte
Scope of Works: Demolition of existing R.C. deck, cutting of existing R.C. piles (105 units), reconstruction, widening and extension of R.C. Pier-Breakwater (15.0m x 105.0m) and mooring / fendering system (14/22 sets).
Project Owner: Republic of the Philippines, Philippine Ports Authority (PPA)
Location: Philippines, Visayas, Eastern Visayas, Southern Leyte
Project Cost: PHP 91,338,558.20
Date Completed: December 2004 to October 2006