Package 6A: Secondary Road (Pasong Tamo) Metro Manila Urban Transport Integration Project, Phase 1

Scope of Works: Construction along Arnaiz Ave. to J.P. Rizal St. for the removal and replacement of the existing concrete pavement, drainage structure / reinforcement of box culvert, curbs and gutters, sidewalk, road signs and road markings, streetlights and landscaping works.

Project Cost: PHP 109,144,023.01

Date Completed: June 2002 to March 2004

Land Development of the MWSS Corporate Office Employees Housing Project

Scope of Works: Construction of roads, drainage, sewer system, water distribution, asphalt pavement, electrical works and water supply system.

Project Cost: PHP 22,710,232.83

Date Completed: December 2003 to November 2004

Construction/ Improvement of Malaybalay Water Supply System

Scope of Works: Construction of reinforced ground reservoir with capacity of 1600 cu.m. at Brgy. Sumpong; Installation about 15.0 km transmission line of size ranging from 150mm to 400mm dia. including waterway crossing; Construction of a treatment plant at Kimambong, Brgy. Sumpong; Construction of diversion dam and intake structure at Kibalabag creek, installation of valves, interconnections, pipe appurtenances and all related miscellaneous civil works.

Project Cost: PHP 113,058,819.98

Date Completed: January 2004 to September 2005

Construction of Urdaneta City Water Supply System

Scope of Works: Construction of 2-well pump station structures complete with related civil and electromechanical works; furnishing of 2- submersible pump sets with an average capacity of 50 lps at 17m TDH, construction of 2 booster pump stations with 6 pump sets with variable speed drives and with an average capacity of 21 lps at 39m TDH, complete with pipes, valves and fittings; furnishing of powerline extension and tapping, construction of 2-100 cu.m. capacity circular concrete ground reservoirs complete with related civil and electromechanical works and supply and installation of approximately 66 km. of transmission and distribution pipelines with sizes ranging from 50mm – 300mm diameter complete with valves, fittings, blow-offs, fire hydrants and related pipe appurtenances.

Project Cost: PHP 108,812,800.20

Date Completed: August 2005 To September 2006

Reconstruction, Widening and Extension of R.C. Pier

Scope of Works: Demolition of existing R.C. deck, cutting of existing R.C. piles (105 units), reconstruction, widening and extension of R.C. Pier-Breakwater (15.0m x 105.0m) and mooring / fendering system (14/22 sets).

Project Cost: PHP 91,338,558.20

Date Completed: December 2004 to October 2006

Completion of Remaining Land Dev’t Works, Garbage Disposal, Construction of Sewage of Treatment Plant and Repair of Permanent Housing in Smokey Mountain

Scope of Works: Land development works, garbage disposal, construction of 2 unit Sewerage Treatment Plants, Repair of permanent housing in Smokey Mountain Development Reclamation Project

Project Cost: PHP 217,993,931.95

Date Completed: March 2004 to January 2006

Rehabilitation of Surigao – Davao Coastal Road Manay – Mati

Scope of Works: This project includes improvement and widening of the existing road of about 70.42 kms. closely following the existing alignment, Port Cement Concrete Pavement (PCCP) has 6.70 meter width, subbase shoulder and improvement of drainage structures, provision of road protection works and construction of bridge.

Project Cost: PHP 756,668,473.73

Date Completed: October 2004 – September 2008

Financing and Development of the 50 Has. Resettlement Project, Phase 1, Brgy. Poblacion, Muntinlupa City

Scope of Works: Site and land development of 50 hectares reserved area including survey works, drainage, water supply, sewer system, road works and power supply.

Project Cost: PHP 164,021,155.14

Date Completed: July 2007 to October 2009

Supply, Installation & Commissioning of Elevator & Escalator, Calapan City Public Market & Passenger Terminal in San Vicente North, Calapan City

Scope of Works: Supply, Installation & Commissioning of Elevator & Escalator, Calapan City Public Market & Passenger Terminal in San Vicente North, Calapan City

Project Cost: PHP 12,400,00.00

Date Completed: October 2010 to January 2011

Planning, Design, Construction & Site Development of Calapan City Public Market & Passenger Terminal

Scope of Works: Planning, design, construction and site development of Calapan Public Market and passenger terminal.

Project Cost: PHP 212,518,031.71

Date Completed: June 2009 to March 2011