Smokey Mountain Development and Reclamation Project

Scope of Works: Reclamation of 79 hectares with containment structures for passenger cargo terminal, port and berthing facilities, dredging/removal of unsuitable materials. Land Filling with compaction. Dredging of South ends and North portion of the 79 hectares, construction of temporary housing and construction of 21- five-storey building permanent housing including site development works.

Project Cost: PHP 4,760,248,791.61

Date Completed: January 1996 to May 2002

Design, Site Development and Construction of a Secondary Hospital & Medical Commercial Center

Scope of Works: Design, site development and construction of secondary hospital and medical commercial center.

Project Cost: PHP 202,999,777.00

Date Completed: December 2000 to June 2002

Construction of Port Harbor Causeway

Scope of Works: Construction of Causeway, break bulk / container yard / common berthing, pier (250 Lm) working apron, pier (300Lm)

Location:

Project Cost: PHP 124,279,308.96

Date Completed: December 1997 to October 2001

Land Development for AGL Heights – GSIS City Project

Scope of Works: Land development and construction of 990 housing units with commercial facility including survey works, construction of roads, water supply system, drainage system, elevated water tanks & power supply.

Project Cost: PHP 241,657,919.30

Date Completed: January 2000 to May 2001

Contract No. ATD – 13/16 Pipelaying Works in Various Locations in Quezon City and Caloocan City (Angat Water Optimization Project)

Scope of Works: Pipelaying works in various locations of Caloocan City and Quezon City.

Project Cost: PHP 97,614,664.50

Date Completed: January 2000 to March 2002

Construction of Tertiary Distribution System (Angat Water Optimization Project) at Tala Estate, North Caloocan

Scope of Works: Construction of tertiary distribution system at Tala Estate, Caloocan City.

Project Cost: PHP 138,533,616.00

Date Completed: July 2000 to April 2002

Package 6B – Improvement of Secondary Roads Project (San Marcelino St./D. Romualdez St./Legarda St./Quezon Blvd.)

Scope of Works: This project consist of road repair works through removal and replacement of damaged PCC Pavement, the provision of a new asphalt concrete overlay, declogging of the existing drainage lines and the rehabilitation of the pedestrian sidewalks.

Project Cost: PHP 49,652,418.78

Date Completed: June 2002 to August 2003

Pinatubo Hazard Urgent Mitigation Project

Scope of Works: Reconstruction of 9.6km Minalin Tail Dike, the construction of Gugu bridge, construction of evacuation road and channelization of Gugu creek.

Project Cost: PHP 426,298,322.71

Date Completed: October 2000 to September 2003

Construction of Three (3) Buildings for Camarin Medium Rise Housing Project

Scope of Works: Design and construction of three (3) medium rise building including land development

Project Cost: PHP 38,319,286.71

Date Completed: April 2002 to September 2003

Design, Site Development and Construction of the Caloocan City Hall Park with Commercial Area and Toll Parking Project

Scope of Works: Design, site development and construction of three – storey Toll Parking building.

Project Cost: PHP 217,499,000.00

Date Completed: December 2000 to November 2003