Land Development of the MWSS Corporate Office Employees Housing Project

Scope of Works: Construction of roads, drainage, sewer system, water distribution, asphalt pavement, electrical works and water supply system.

Project Cost: PHP 22,710,232.83

Date Completed: December 2003 to November 2004

Contract No. ATD – 13/16 Pipelaying Works in Various Locations in Quezon City and Caloocan City (Angat Water Optimization Project)

Scope of Works: Pipelaying works in various locations of Caloocan City and Quezon City.

Project Cost: PHP 97,614,664.50

Date Completed: January 2000 to March 2002

Larossa Phase 1, Design and Construction of Three (3) Buildings Eleven (11) Storey (1A-Camia, 1C-Sampaguita and 1B- Magnolia)

Scope of Works: Design and Construction of Three (3) Buildings Eleven (11) Storey (1A-Camia, 1C-Sampaguita and 1B-Magnolia) including excavation and trimming, civil and structural works, architectural and finishing works, electrical works, mechanical and plumbing works, equipment operations and maintenance works.

Project Cost: PHP 1,300,528,232.40

Date Completed: July 2012 to August 2017

Construction of the Proposed Department of Chemical Engineering Building Engineering Complex, U.P., Diliman, Quezon City

Scope of Works: Construction of the Proposed Department of Chemical Engineering Building (Eight Faculty Rooms and Six Classrooms, Chemical Engineering Research, Instructional and Extension Laboratories) equipped with centralized air-conditioning units, electrical and mechanical system and land development.

Project Cost: PHP 115,438,596.47

Date Completed: June 2011 to September 2014

Design and Build of Joint Sewage and Septage Treatment Plant and Facilities

Scope of Works: Design and build of joint sewage and septage treatment plant and facilities which includes civil works, electro-mechanical works, installation and other services, design services and supply and delivery of plant and equipment.

Project Cost: PHP 266,277,888.00

Date Completed: December 2011 to August 2014