Mindanao

Rehabilitation of Surigao – Davao Coastal Road Manay – Mati
Scope of Works: This project includes improvement and widening of the existing road of about 70.42 kms. closely following the existing alignment, Port Cement Concrete Pavement (PCCP) has 6.70 meter width, subbase shoulder and improvement of drainage structures, provision of road protection works and construction of bridge.
Location: Philippines, Mindanao, Davao, Davao Oriental
Project Cost: PHP 756,668,473.73
Date Completed: October 2004 – September 2008

Construction/ Improvement of Malaybalay Water Supply System
Scope of Works: Construction of reinforced ground reservoir with capacity of 1600 cu.m. at Brgy. Sumpong; Installation about 15.0 km transmission line of size ranging from 150mm to 400mm dia. including waterway crossing; Construction of a treatment plant at Kimambong, Brgy. Sumpong; Construction of diversion dam and intake structure at Kibalabag creek, installation of valves, interconnections, pipe appurtenances and all related miscellaneous civil works.
Location: Philippines, Mindanao, Bukidnon, Malaybalay
Project Cost: PHP 113,058,819.98
Date Completed: January 2004 to September 2005