Central Luzon

Pinatubo Hazard Urgent Mitigation Project

Scope of Works: Reconstruction of 9.6km Minalin Tail Dike, the construction of Gugu bridge, construction of evacuation road and channelization of Gugu creek.

Project Cost: PHP 426,298,322.71

Date Completed: October 2000 to September 2003

Construction of the Horizontal Infrastructure Project of the Clark International Airport New Terminal Building Project (Formerly Clark Airport Low Cost Terminal)

Scope of Works: Demolition of affected taxiways and old runway; Construction of new taxiways; Conversion of old runway to taxiway (G); Construction of taxiway shoulders; Construction of new apron, apron lighting, drainage and other embedded utilities prerequisite to concrete pavement; Installation / application of newly required markings and visual aids (signage and lightings) on taxiways and apron; Required grading of buffer and appurtenant areas for drainage and other related facilities; and Sodding of affected areas .

Project Cost: PHP 2,407,743,122.79

Date Completed: December 2018 to March 2021

Construction of Taxiway Access Road at Clark International Airport South-End Area

Scope of Works: Construction of New Taxiways and access road at Clark International Airport South End Area which includes construction of Taxiway shoulders, apron, drainage, markings and visual aids, and other related works.

Project Cost: PHP 86,975,099.26

Date Completed: June 2019 to February 2021

Converge and Special Support Program; Construction/Improvement of access roads to leading to trades, SCTEX connecting road

Scope of Works: Demobilization, Individual Removal of Trees, Removal of Structures and Improvement of access roads to leading to trades, SCTEX Obstruction, Unsuitable Excavation, Structure Excavation, Embankment connecting road in support of furniture, 1T-BPM, Hotels, from Borrow, Subgrade Preparation, Aggregate Subbase Course, PCCP Garments and Textile Industries, Angeles City, Pampanga. (Unreinforced) 0.30m thk., Reinforcing Steel (Grade 40). Structural Concrete (Class A). Pipe Culverts, Metal Guard Rail including Post, Metal Beam End Piece, Furnishing and Placing Topsoil, Sodding, Reflectorized Pavement Markings (yellow) and Reflectorized Pavement Marking(white)

Project Cost: PHP 27,841,585.38

Date Completed: May 2019 to January 2020

Philippines Export Zone {PEZA) Road connecting Angeles – Magalang Road to East Circumferential Road

Scope of Works: Mobilization/Demobilization, Individual Removal of Trees {small, 501-750mm ยข), Removal of Structures and Obstruction, Unsuitable Excavation {Roadway Excavation), Structure Excavation, Embankment from Borrow, Subgrade Preparation, Aggregate Subbase Course, Portland Cement Concrete Pavement (Unreinforced) 0.30m thk., Reinforcing Steel {Grade 40), Structural Concrete (Class A}, Reflectorized Thermoplastic Pavement Markings White, and Curb and Gutter (Cast in Place).

Project Cost: PHP 13,888,690.00

Date Completed: May 2019 to November 2019