Projects completed under

Republic of the Philippines

Construction of Urdaneta City Water Supply System

Scope of Works: Construction of 2-well pump station structures complete with related civil and electromechanical works; furnishing of 2- submersible pump sets with an average capacity of 50 lps at 17m TDH, construction of 2 booster pump stations with 6 pump sets with variable speed drives and with an average capacity of 21 lps at 39m TDH, complete with pipes, valves and fittings; furnishing of powerline extension and tapping, construction of 2-100 cu.m. capacity circular concrete ground reservoirs complete with related civil and electromechanical works and supply and installation of approximately 66 km. of transmission and distribution pipelines with sizes ranging from 50mm – 300mm diameter complete with valves, fittings, blow-offs, fire hydrants and related pipe appurtenances.

Project Cost: PHP 108,812,800.20

Date Completed: August 2005 To September 2006

Construction of the Horizontal Infrastructure Project of the Clark International Airport New Terminal Building Project (Formerly Clark Airport Low Cost Terminal)

Scope of Works: Demolition of affected taxiways and old runway; Construction of new taxiways; Conversion of old runway to taxiway (G); Construction of taxiway shoulders; Construction of new apron, apron lighting, drainage and other embedded utilities prerequisite to concrete pavement; Installation / application of newly required markings and visual aids (signage and lightings) on taxiways and apron; Required grading of buffer and appurtenant areas for drainage and other related facilities; and Sodding of affected areas .

Project Cost: PHP 2,407,743,122.79

Date Completed: December 2018 to March 2021

Construction/ Improvement of Malaybalay Water Supply System

Scope of Works: Construction of reinforced ground reservoir with capacity of 1600 cu.m. at Brgy. Sumpong; Installation about 15.0 km transmission line of size ranging from 150mm to 400mm dia. including waterway crossing; Construction of a treatment plant at Kimambong, Brgy. Sumpong; Construction of diversion dam and intake structure at Kibalabag creek, installation of valves, interconnections, pipe appurtenances and all related miscellaneous civil works.

Project Cost: PHP 113,058,819.98

Date Completed: January 2004 to September 2005

Construction of Taxiway Access Road at Clark International Airport South-End Area

Scope of Works: Construction of New Taxiways and access road at Clark International Airport South End Area which includes construction of Taxiway shoulders, apron, drainage, markings and visual aids, and other related works.

Project Cost: PHP 86,975,099.26

Date Completed: June 2019 to February 2021

Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide – Secondary Roads, Tagudin – Cervantes Road (S00140LZ), Suyo, Ilocos Sur

Scope of Works: Construction of drainage and slope protection structures. Installation of active protection system along Tagudin – Cervantes

Project Cost: PHP 57,338,819.85

Date Completed: Áugust 2020 to January 2021

Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide, – Tertiary Roads, Cervantes – Mankayan – Abatan Road

Scope of Works: Construction of drainage and slope protection structures. Installation of active protection system along Cervantes – Mankayan – Abatan Road

Project Cost: PHP 57,338,819.85

Date Completed: Áugust 2020 to January 2021

Converge and Special Support Program; Construction/Improvement of access roads to leading to trades, SCTEX connecting road

Scope of Works: Demobilization, Individual Removal of Trees, Removal of Structures and Improvement of access roads to leading to trades, SCTEX Obstruction, Unsuitable Excavation, Structure Excavation, Embankment connecting road in support of furniture, 1T-BPM, Hotels, from Borrow, Subgrade Preparation, Aggregate Subbase Course, PCCP Garments and Textile Industries, Angeles City, Pampanga. (Unreinforced) 0.30m thk., Reinforcing Steel (Grade 40). Structural Concrete (Class A). Pipe Culverts, Metal Guard Rail including Post, Metal Beam End Piece, Furnishing and Placing Topsoil, Sodding, Reflectorized Pavement Markings (yellow) and Reflectorized Pavement Marking(white)

Project Cost: PHP 27,841,585.38

Date Completed: May 2019 to January 2020

Philippines Export Zone {PEZA) Road connecting Angeles – Magalang Road to East Circumferential Road

Scope of Works: Mobilization/Demobilization, Individual Removal of Trees {small, 501-750mm ¢), Removal of Structures and Obstruction, Unsuitable Excavation {Roadway Excavation), Structure Excavation, Embankment from Borrow, Subgrade Preparation, Aggregate Subbase Course, Portland Cement Concrete Pavement (Unreinforced) 0.30m thk., Reinforcing Steel {Grade 40), Structural Concrete (Class A}, Reflectorized Thermoplastic Pavement Markings White, and Curb and Gutter (Cast in Place).

Project Cost: PHP 13,888,690.00

Date Completed: May 2019 to November 2019

Rehabilitaiton and Reconstruction of Roads with Slips, Slope Collapse, and Landslide along Tablas Circumferential Road, Romblon

Scope of Works: Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse and Landslide

Project Cost: PHP 128,098,069.24

Date Completed: May 2021 to May 2022

Rehabilitation and Reconstruction of Roads with Slips, Slope Collapse, and Landslide along Tablas Circumferential Road, Romblon

Scope of Works: Roads: Construction – slope protection using structural measures (revetment, retaining structures, wirenet)

Project Cost: PHP 137,313,210.97

Date Completed: April 2021 to April 2022