Projects completed under

Republic of the Philippines

Design and Build of Joint Sewage and Septage Treatment Plant and Facilities

Scope of Works: Design and build of joint sewage and septage treatment plant and facilities which includes civil works, electro-mechanical works, installation and other services, design services and supply and delivery of plant and equipment.

Project Cost: PHP 266,277,888.00

Date Completed: December 2011 to August 2014

Planning, Design, Construction and Site Development of the Proposed Hawker’s Plaza

Scope of Works: Development of the Proposed Hawker’s Plaza Calapan City Public Market; Planning, Design, Construction & Site Development of the Proposed Hawker’s Plaza at the Calapan City Public Market.

Project Cost: PHP 12,047,747.00

Date Completed: November 2012 to March 2013

Planning, Design, Construction & Site Development of Calapan City Public Market & Passenger Terminal

Scope of Works: Planning, design, construction and site development of Calapan Public Market and passenger terminal.

Project Cost: PHP 212,518,031.71

Date Completed: June 2009 to March 2011

Supply, Installation & Commissioning of Elevator & Escalator, Calapan City Public Market & Passenger Terminal in San Vicente North, Calapan City

Scope of Works: Supply, Installation & Commissioning of Elevator & Escalator, Calapan City Public Market & Passenger Terminal in San Vicente North, Calapan City

Project Cost: PHP 12,400,00.00

Date Completed: October 2010 to January 2011

Financing and Development of the 50 Has. Resettlement Project, Phase 1, Brgy. Poblacion, Muntinlupa City

Scope of Works: Site and land development of 50 hectares reserved area including survey works, drainage, water supply, sewer system, road works and power supply.

Project Cost: PHP 164,021,155.14

Date Completed: July 2007 to October 2009

Rehabilitation of Surigao – Davao Coastal Road Manay – Mati

Scope of Works: This project includes improvement and widening of the existing road of about 70.42 kms. closely following the existing alignment, Port Cement Concrete Pavement (PCCP) has 6.70 meter width, subbase shoulder and improvement of drainage structures, provision of road protection works and construction of bridge.

Project Cost: PHP 756,668,473.73

Date Completed: October 2004 – September 2008

Completion of Remaining Land Dev’t Works, Garbage Disposal, Construction of Sewage of Treatment Plant and Repair of Permanent Housing in Smokey Mountain

Scope of Works: Land development works, garbage disposal, construction of 2 unit Sewerage Treatment Plants, Repair of permanent housing in Smokey Mountain Development Reclamation Project

Project Cost: PHP 217,993,931.95

Date Completed: March 2004 to January 2006

Reconstruction, Widening and Extension of R.C. Pier

Scope of Works: Demolition of existing R.C. deck, cutting of existing R.C. piles (105 units), reconstruction, widening and extension of R.C. Pier-Breakwater (15.0m x 105.0m) and mooring / fendering system (14/22 sets).

Project Cost: PHP 91,338,558.20

Date Completed: December 2004 to October 2006

Rehabilitaiton and Reconstruction of Roads with Slips, Slope Collapse, and Landslide along Tablas Circumferential Road, Romblon

Scope of Works: Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse and Landslide

Project Cost: PHP 128,098,069.24

Date Completed: May 2021 to May 2022

Rehabilitation and Reconstruction of Roads with Slips, Slope Collapse, and Landslide along Tablas Circumferential Road, Romblon

Scope of Works: Roads: Construction – slope protection using structural measures (revetment, retaining structures, wirenet)

Project Cost: PHP 137,313,210.97

Date Completed: April 2021 to April 2022