Construction of Three (3) Buildings for Camarin Medium Rise Housing Project

Scope of Works: Design and construction of three (3) medium rise building including land development

Project Cost: PHP 38,319,286.71

Date Completed: April 2002 to September 2003

Pinatubo Hazard Urgent Mitigation Project

Scope of Works: Reconstruction of 9.6km Minalin Tail Dike, the construction of Gugu bridge, construction of evacuation road and channelization of Gugu creek.

Project Cost: PHP 426,298,322.71

Date Completed: October 2000 to September 2003

Package 6B – Improvement of Secondary Roads Project (San Marcelino St./D. Romualdez St./Legarda St./Quezon Blvd.)

Scope of Works: This project consist of road repair works through removal and replacement of damaged PCC Pavement, the provision of a new asphalt concrete overlay, declogging of the existing drainage lines and the rehabilitation of the pedestrian sidewalks.

Project Cost: PHP 49,652,418.78

Date Completed: June 2002 to August 2003

Construction of Tertiary Distribution System (Angat Water Optimization Project) at Tala Estate, North Caloocan

Scope of Works: Construction of tertiary distribution system at Tala Estate, Caloocan City.

Project Cost: PHP 138,533,616.00

Date Completed: July 2000 to April 2002

Contract No. ATD – 13/16 Pipelaying Works in Various Locations in Quezon City and Caloocan City (Angat Water Optimization Project)

Scope of Works: Pipelaying works in various locations of Caloocan City and Quezon City.

Project Cost: PHP 97,614,664.50

Date Completed: January 2000 to March 2002

Design, Site Development and Construction of a Secondary Hospital & Medical Commercial Center

Scope of Works: Design, site development and construction of secondary hospital and medical commercial center.

Project Cost: PHP 202,999,777.00

Date Completed: December 2000 to June 2002

Smokey Mountain Development and Reclamation Project

Scope of Works: Reclamation of 79 hectares with containment structures for passenger cargo terminal, port and berthing facilities, dredging/removal of unsuitable materials. Land Filling with compaction. Dredging of South ends and North portion of the 79 hectares, construction of temporary housing and construction of 21- five-storey building permanent housing including site development works.

Project Cost: PHP 4,760,248,791.61

Date Completed: January 1996 to May 2002

Land Development of the MWSS Corporate Office Employees Housing Project

Scope of Works: Construction of roads, drainage, sewer system, water distribution, asphalt pavement, electrical works and water supply system.

Project Cost: PHP 22,710,232.83

Date Completed: December 2003 to November 2004

Package 6A: Secondary Road (Pasong Tamo) Metro Manila Urban Transport Integration Project, Phase 1

Scope of Works: Construction along Arnaiz Ave. to J.P. Rizal St. for the removal and replacement of the existing concrete pavement, drainage structure / reinforcement of box culvert, curbs and gutters, sidewalk, road signs and road markings, streetlights and landscaping works.

Project Cost: PHP 109,144,023.01

Date Completed: June 2002 to March 2004

Design, Site Development and Construction of the Caloocan City Hall Park with Commercial Area and Toll Parking Project

Scope of Works: Design, site development and construction of three – storey Toll Parking building.

Project Cost: PHP 217,499,000.00

Date Completed: December 2000 to November 2003