DPWH (Head Office)
Pinatubo Hazard Urgent Mitigation Project
Scope of Works: Reconstruction of 9.6km Minalin Tail Dike, the construction of Gugu bridge, construction of evacuation road and channelization of Gugu creek.
Location: Philippines, Central Luzon, Pampanga
Project Cost: PHP 426,298,322.71
Date Completed: October 2000 to September 2003
Package 6B – Improvement of Secondary Roads Project (San Marcelino St./D. Romualdez St./Legarda St./Quezon Blvd.)
Scope of Works: This project consist of road repair works through removal and replacement of damaged PCC Pavement, the provision of a new asphalt concrete overlay, declogging of the existing drainage lines and the rehabilitation of the pedestrian sidewalks.
Location: Philippines, NCR, Metro Manila, Manila
Project Cost: PHP 49,652,418.78
Date Completed: June 2002 to August 2003
Rehabilitation of Surigao – Davao Coastal Road Manay – Mati
Scope of Works: This project includes improvement and widening of the existing road of about 70.42 kms. closely following the existing alignment, Port Cement Concrete Pavement (PCCP) has 6.70 meter width, subbase shoulder and improvement of drainage structures, provision of road protection works and construction of bridge.
Location: Philippines, Mindanao, Davao, Davao Oriental
Project Cost: PHP 756,668,473.73
Date Completed: October 2004 – September 2008