Projects completed under

Water Infrastructure

Contract No. ATD – 13/16 Pipelaying Works in Various Locations in Quezon City and Caloocan City (Angat Water Optimization Project)

Scope of Works: Pipelaying works in various locations of Caloocan City and Quezon City.

Project Cost: PHP 97,614,664.50

Date Completed: January 2000 to March 2002

Design and Build of Joint Sewage and Septage Treatment Plant and Facilities

Scope of Works: Design and build of joint sewage and septage treatment plant and facilities which includes civil works, electro-mechanical works, installation and other services, design services and supply and delivery of plant and equipment.

Project Cost: PHP 266,277,888.00

Date Completed: December 2011 to August 2014

Construction of Urdaneta City Water Supply System

Scope of Works: Construction of 2-well pump station structures complete with related civil and electromechanical works; furnishing of 2- submersible pump sets with an average capacity of 50 lps at 17m TDH, construction of 2 booster pump stations with 6 pump sets with variable speed drives and with an average capacity of 21 lps at 39m TDH, complete with pipes, valves and fittings; furnishing of powerline extension and tapping, construction of 2-100 cu.m. capacity circular concrete ground reservoirs complete with related civil and electromechanical works and supply and installation of approximately 66 km. of transmission and distribution pipelines with sizes ranging from 50mm – 300mm diameter complete with valves, fittings, blow-offs, fire hydrants and related pipe appurtenances.

Project Cost: PHP 108,812,800.20

Date Completed: August 2005 To September 2006

Construction/ Improvement of Malaybalay Water Supply System

Scope of Works: Construction of reinforced ground reservoir with capacity of 1600 cu.m. at Brgy. Sumpong; Installation about 15.0 km transmission line of size ranging from 150mm to 400mm dia. including waterway crossing; Construction of a treatment plant at Kimambong, Brgy. Sumpong; Construction of diversion dam and intake structure at Kibalabag creek, installation of valves, interconnections, pipe appurtenances and all related miscellaneous civil works.

Project Cost: PHP 113,058,819.98

Date Completed: January 2004 to September 2005