Projects completed under

Construction

Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide – Secondary Roads, Tagudin – Cervantes Road (S00140LZ), Suyo, Ilocos Sur

Scope of Works: Construction of drainage and slope protection structures. Installation of active protection system along Tagudin – Cervantes

Project Cost: PHP 57,338,819.85

Date Completed: Áugust 2020 to January 2021

Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide, – Tertiary Roads, Cervantes – Mankayan – Abatan Road

Scope of Works: Construction of drainage and slope protection structures. Installation of active protection system along Cervantes – Mankayan – Abatan Road

Project Cost: PHP 57,338,819.85

Date Completed: Áugust 2020 to January 2021

Larossa Phase 1, Design and Construction of Three (3) Buildings Eleven (11) Storey (1A-Camia, 1C-Sampaguita and 1B- Magnolia)

Scope of Works: Design and Construction of Three (3) Buildings Eleven (11) Storey (1A-Camia, 1C-Sampaguita and 1B-Magnolia) including excavation and trimming, civil and structural works, architectural and finishing works, electrical works, mechanical and plumbing works, equipment operations and maintenance works.

Project Cost: PHP 1,300,528,232.40

Date Completed: July 2012 to August 2017

Harbour Port Terminal, Inc. Improvement and Rehabilitation Project

Scope of Works: Concreting of port apron & berthing area including pile driving; containment structure and supply and delivery of mooring bollards; yard concreting and paving including water distribution system; and horizontal development of 79 has. road networks including electrical distribution electrical distribution system.

Project Cost: PHP 1,706,195,000.78

Date Completed: May 2013 to May 2015

Construction of the Proposed Department of Chemical Engineering Building Engineering Complex, U.P., Diliman, Quezon City

Scope of Works: Construction of the Proposed Department of Chemical Engineering Building (Eight Faculty Rooms and Six Classrooms, Chemical Engineering Research, Instructional and Extension Laboratories) equipped with centralized air-conditioning units, electrical and mechanical system and land development.

Project Cost: PHP 115,438,596.47

Date Completed: June 2011 to September 2014

Supply, Installation & Commissioning of Elevator & Escalator, Calapan City Public Market & Passenger Terminal in San Vicente North, Calapan City

Scope of Works: Supply, Installation & Commissioning of Elevator & Escalator, Calapan City Public Market & Passenger Terminal in San Vicente North, Calapan City

Project Cost: PHP 12,400,00.00

Date Completed: October 2010 to January 2011

Rehabilitation of Surigao – Davao Coastal Road Manay – Mati

Scope of Works: This project includes improvement and widening of the existing road of about 70.42 kms. closely following the existing alignment, Port Cement Concrete Pavement (PCCP) has 6.70 meter width, subbase shoulder and improvement of drainage structures, provision of road protection works and construction of bridge.

Project Cost: PHP 756,668,473.73

Date Completed: October 2004 – September 2008

Reconstruction, Widening and Extension of R.C. Pier

Scope of Works: Demolition of existing R.C. deck, cutting of existing R.C. piles (105 units), reconstruction, widening and extension of R.C. Pier-Breakwater (15.0m x 105.0m) and mooring / fendering system (14/22 sets).

Project Cost: PHP 91,338,558.20

Date Completed: December 2004 to October 2006

Construction of Multi-Purpose Building, Las Piñas City

Scope of Works: Construction of Multi-Purpose Building, Las Piñas City

Project Cost: PHP 144,741,202.60

Date Completed: October 2020 to November 2021

Rehabilitaiton and Reconstruction of Roads with Slips, Slope Collapse, and Landslide along Tablas Circumferential Road, Romblon

Scope of Works: Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse and Landslide

Project Cost: PHP 128,098,069.24

Date Completed: May 2021 to May 2022