R-II Builders, Inc.

Projects completed under

Construction

Design, Site Development and Construction of a Secondary Hospital & Medical Commercial Center

Scope of Works: Design, site development and construction of secondary hospital and medical commercial center.

Project Cost: PHP 202,999,777.00

Date Completed: December 2000 to June 2002

Construction of Port Harbor Causeway

Scope of Works: Construction of Causeway, break bulk / container yard / common berthing, pier (250 Lm) working apron, pier (300Lm)

Location:

Project Cost: PHP 124,279,308.96

Date Completed: December 1997 to October 2001

Construction of Tertiary Distribution System (Angat Water Optimization Project) at Tala Estate, North Caloocan

Scope of Works: Construction of tertiary distribution system at Tala Estate, Caloocan City.

Project Cost: PHP 138,533,616.00

Date Completed: July 2000 to April 2002

Package 6B – Improvement of Secondary Roads Project (San Marcelino St./D. Romualdez St./Legarda St./Quezon Blvd.)

Scope of Works: This project consist of road repair works through removal and replacement of damaged PCC Pavement, the provision of a new asphalt concrete overlay, declogging of the existing drainage lines and the rehabilitation of the pedestrian sidewalks.

Project Cost: PHP 49,652,418.78

Date Completed: June 2002 to August 2003

Pinatubo Hazard Urgent Mitigation Project

Scope of Works: Reconstruction of 9.6km Minalin Tail Dike, the construction of Gugu bridge, construction of evacuation road and channelization of Gugu creek.

Project Cost: PHP 426,298,322.71

Date Completed: October 2000 to September 2003

Design, Site Development and Construction of the Caloocan City Hall Park with Commercial Area and Toll Parking Project

Scope of Works: Design, site development and construction of three – storey Toll Parking building.

Project Cost: PHP 217,499,000.00

Date Completed: December 2000 to November 2003

Package 6A: Secondary Road (Pasong Tamo) Metro Manila Urban Transport Integration Project, Phase 1

Scope of Works: Construction along Arnaiz Ave. to J.P. Rizal St. for the removal and replacement of the existing concrete pavement, drainage structure / reinforcement of box culvert, curbs and gutters, sidewalk, road signs and road markings, streetlights and landscaping works.

Project Cost: PHP 109,144,023.01

Date Completed: June 2002 to March 2004

Land Development of the MWSS Corporate Office Employees Housing Project

Scope of Works: Construction of roads, drainage, sewer system, water distribution, asphalt pavement, electrical works and water supply system.

Project Cost: PHP 22,710,232.83

Date Completed: December 2003 to November 2004

Supply, Installation & Commissioning of Elevator & Escalator, Calapan City Public Market & Passenger Terminal in San Vicente North, Calapan City

Scope of Works: Supply, Installation & Commissioning of Elevator & Escalator, Calapan City Public Market & Passenger Terminal in San Vicente North, Calapan City

Project Cost: PHP 12,400,00.00

Date Completed: October 2010 to January 2011

Reconstruction, Widening and Extension of R.C. Pier

Scope of Works: Demolition of existing R.C. deck, cutting of existing R.C. piles (105 units), reconstruction, widening and extension of R.C. Pier-Breakwater (15.0m x 105.0m) and mooring / fendering system (14/22 sets).

Project Cost: PHP 91,338,558.20

Date Completed: December 2004 to October 2006