Construction/ Improvement of Malaybalay Water Supply System

Project Title: Construction/ Improvement of Malaybalay Water Supply System

Scope of Works: Construction of reinforced ground reservoir with capacity of 1600 cu.m. at Brgy. Sumpong; Installation about 15.0 km transmission line of size ranging from 150mm to 400mm dia. including waterway crossing; Construction of a treatment plant at Kimambong, Brgy. Sumpong; Construction of diversion dam and intake structure at Kibalabag creek, installation of valves, interconnections, pipe appurtenances and all related miscellaneous civil works.

Project Cost: PHP 113,058,819.98

Date Completed: January 2004 to September 2005